CAPE ZIRCONA PROJECT OF PANEX

The Project

A zircon-rich resource, mineralised from surface.

Cape Zircon covers a heavy mineral sands deposit on the West Coast with a JORC Mineral Resource (October 2026), a completed Preliminary Economic Assessment (September 2025) and a Pre-Feasibility Study targeted for end March 2027.

Prospecting rights

Two prospecting rights held by Buchuberg Resources cover 47,966 ha. They are valid to 31 October 2028 and automatically renewable for 3 years thereafter. Tenure and location

Mineral Resource

901.4 million tonnes at 3.44% THM.

JORC Mineral Resource estimate, October 2026, at a 1.5% THM cut-off. Measured and Indicated make up 76% of the tonnes.

CategoryTonnes (Mt)THM %Slimes %Ilmenite %Rutile %Zircon %Monazite %
Measured324.63.3122.761.250.360.370.010
Indicated363.23.8718.121.470.360.430.010
Inferred213.52.8922.821.140.320.390.009
Total901.43.4420.901.310.350.400.010
3.6 MtContained zircon
3.2 MtContained rutile
11.8 MtContained ilmenite

Totals may not add due to rounding.

Competent Person statement

The information on this website that relates to Mineral Resources is based on, and fairly represents, information compiled by Mr Bernhard Siebrits of BSCGS, who is registered with SACNAPS and is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr Siebrits has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the JORC Code. Mr Siebrits consents to the inclusion on this website of the matters based on his information in the form and context in which they appear.

By geological unit

The same resource, by geological unit.

Mineral Resource at a 1.5% THM cut-off, October 2026, summarised by geological unit rather than resource category.

Geological unitTonnes (Mt)THM %Slimes %Ilmenite %Rutile %Zircon %Monazite %
Red Aeolian Sands (RAS)174.33.2110.041.420.460.490.010
Orange Feldspathic Sands, high zircon (OFS HZ)569.63.1225.391.180.370.410.009
Orange Feldspathic Sands, low zircon (OFS LZ)127.62.7217.291.000.130.140.006
Strandline (STRL)29.913.6914.324.560.410.590.015
Total901.43.4420.901.310.350.400.010

Assemblage

Heavy mineral assemblage by geological unit.

Percentage of total heavy minerals (THM). The red aeolian sands carry the richest zircon and rutile assemblage.

Geological unitIlmenite %Rutile %Zircon %Monazite %Garnet %Other %
Red Aeolian Sands4414150.32521
Orange Feldspathic Sands HZ3812130.301225
Orange Feldspathic Sands LZ37550.221835
Strandline33340.111247
Total resource3810120.271228

Other comprises mainly pyroxene.

Geology

Three mineralised domains, open to the north and south.

Red Aeolian Sands

0.5 to 3 m of unconsolidated red sand at surface, with up to 30% zircon plus rutile in the heavy mineral assemblage.

Orange Feldspathic Sands

Compacted sands up to 50 m thick beneath the red sands. The high-zircon zone reaches 25 m thick in the west.

Strandlines

High-grade strandlines about 1 km from the coast. Not yet fully delineated: a priority for the next drilling phase.

Mineralisation remains open to the north and south of the current resource. The northern extension lies close to the Olifants River sediment feeder.

Measuring a test pit in the red sands at Cape Zircon
Test pitting, red sands
Test pit sampled with a measuring tape
Test pit sampling
Sample trays showing heavy mineral concentrate from drill intervals
Drill sample trays
Bagged drill samples in the Cape Zircon sample store
Sample store

Planned mining

Load and haul, near-zero strip ratio.

Mining has not started. The PEA mine plan is:

  • Contractor excavators and 30 t trucks would be used
  • 437 Mt scheduled in the PEA mine plan (2025 resource), from the upper, higher-value part of the deposit
  • 1,200 tph from year 1, doubling to 2,400 tph from year 3
  • About 5% of the footprint open at any time, with concurrent backfill and rehabilitation

Planned processing

A standard mineral sands flowsheet.

No plant has been built yet. The PEA design is:

  • Two primary concentration plants: scrubbing, desliming, 4-stage spirals
  • One secondary plant: LIMS and two-stage WHIMS
  • Seawater for processing, no groundwater would be required
  • Planned outputs: crude ilmenite and a zircon-rutile non-magnetic concentrate
FEED PREPARATIONAND SLIMES HANDLINGPRIMARYCONCENTRATIONSECONDARYCONCENTRATIONROM1Crushing, scrubbingand screeningDeslimingcyclonesCD tank3OVERSIZEThickener andslimes transfer72SLIMES DAM4-stagespiral plantHMCEmergencyHMC stockpile6567TAILINGSSTACKINGHMCTrash screenOVERSIZELIMSmags48MAGNETITEnon-magsPrimaryWHIMSmags54CRUDE ILMENITECONCENTRATEnon-magsSecondaryWHIMSnon-mags66NON-MAGCONCENTRATEmagsFEED PREPARATION AND SLIMESPRIMARY CONCENTRATIONSECONDARY CONCENTRATIONROM1Crushing, scrubbingand screening3OVERSIZEDeslimingcyclonesCD tankThickener andslimes transfer72SLIMES DAM4-stagespiral plant6567TAILINGSSTACKINGHMCEmergencyHMC stockpileHMCTrash screenOVERSIZELIMS48MAGNETITEnon-magsPrimary WHIMS54CRUDE ILMENITECONCENTRATEnon-magsSecondary WHIMS66NON-MAGCONCENTRATEmags
Process unitStream numberSaleable products

Process flow diagram, after PEA Figure 5-1.

Planned production

382,000 tonnes of concentrate a year, once in production.

PEA production targets. The project is not producing yet.

16.2 MtpaOre to be mined, LOM average
382 ktpaHeavy mineral product concentrate
253 ktpaCrude ilmenite concentrate
129 ktpaNon-magnetic zircon and rutile concentrate

PEA, September 2025.

Product specifications

Questions

Questions about the Cape Zircon project.

How large is the Cape Zircon Mineral Resource?

901.4 million tonnes at 3.44% total heavy minerals (JORC, October 2026), of which 76% is Measured and Indicated. It contains about 3.6 Mt of zircon, 3.2 Mt of rutile and 11.8 Mt of ilmenite. Mineralisation remains open to the north and south of the current resource.

What is the geology of the Cape Zircon deposit?

Red aeolian sands 0.5 to 3 m thick sit on top of orange feldspathic sands up to 50 m thick, mineralised from surface. High-grade strandlines roughly 1 km from the coast are a target for the next drilling phase.

How would Cape Zircon be mined?

By load and haul, using contractor excavators and trucks, with a near-zero strip ratio. The PEA mine plan (2025 resource) schedules 437 Mt at 1,200 tph, rising to 2,400 tph from year 3.

How would Cape Zircon ore be processed?

In two primary concentration plants (scrubbing, desliming and 4-stage spirals) and one secondary plant (LIMS and two-stage WHIMS), using seawater. The outputs would be a crude ilmenite concentrate and a non-magnetic zircon and rutile concentrate.

Who owns Cape Zircon?

Buchuberg Resources (Pty) Ltd holds the prospecting rights. Its shareholders are Panex Resources (Pty) Ltd, Sandveld Ventures (Pty) Ltd and the VS Madlela Family Trust.

Who should I contact about Cape Zircon?

Questco (Pty) Ltd, corporate advisor to Buchuberg Resources, at capezircon@questco.co.za. All enquiries go through Questco.

Data room

Ready for the next phase.

Companies and institutions evaluating an acquisition or partnership can submit an expression of interest to Questco, corporate advisor to the project, for access to the full PEA, the JORC resource report and supporting data.

Contact us